Our latest news

25/11/2021

Launch of a thermal power plant project in and around the city of Bangui.

Central African Energy (ENERCA) has just acquired a new thermal power plant thanks to bilateral cooperation between the Kingdom of Saudi Arabia and the Central African Republic. This project is the result of the loan agreement signed in December 2015 between the Central African Government and the Saudi Development Fund (SDF).
This new thermal power plant that has just been officially launched this Thursday, November 25, 2021 by the President of the Republic Faustin Archange TOUADERA is part of the strengthening of electricity production in the city of Bangui and its surroundings.

15/07/2021

Start of electrification works in 18 localities in the Adamaoua Region Cameroon

Contract signing ceremony for the rural electrification project in three regions of Cameroon, between the Tunisian company TRAGEDEL and the Cameron Rural Electrification Agency in the presence of the CEO of AER. This project aims at the execution of electrification works in 18 localities in the Adamawa region.

6/05/2021

ISO Certification

Following the certification audit according to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 carried out within our company «TRAGEDEL» on 06 and 07 May 2021, we inform you that the audit team has favorably recommended our certification, for the following application area:
Turnkey project management in:
  • Water management infrastructure (boreholes, supply networks,pumping stations, treatment stations.
  • Production and transport infrastructure and facilities electricity.
  • Industrial installation.
  • 18/11/2020

    Signing ceremony of the project to replace the drinking water supply system of the city of Bangui in the presence of His Excellency the Minister of Economy, Plan and Cooperation

    The Minister of the Economy, Félix Moloua, chaired on Wednesday November 18, 2020, the signing ceremony of the contract for the replacement project for the drinking water supply system in the city of Bangui, between the TRAGEDEL TUNISIE-SIAD RCA group and the Ministry of Energy and Hydraulics. Financed by the Saudi Development Fund (FSD), this project will not only improve water quality, but also its distribution throughout the city of Bangui and its surroundings. It also aims to extend the water pipe pipes in the Municipality of Bimbo..

    24/11/2020

    Launch ceremony for the project to replace the drinking water supply system (PSS) in the city of Bangui

    LAUNCHING OF THE DRINKING WATER SUPPLY SYSTEM REPLACEMENT PROJECT (AEP)IN THE CITY OF BANGUI The Minister of Economy of the Planning and Cooperation Félix Moloua, officially launched, on Tuesday November 24, 2020, the project of replacement of the drinking water supply system (AEP), executed by the Tunisian company: Groupement TRGEDEL / SIAD Centrafrique, in the city of Bangui, in the presence of executives from the Department of Economy, Energy and hydraulic resources, of the General Director of SODECA..

    02/03/2020

    Press conference of the Minister of Energy Development and Water Resources of the Central African Republic in the presence of the company TRAGEDEL

    Official Launch Ceremony in the presence of His Excellency Professor Faustin-Archange Touadéra President of the Central African Republic

    18/06/2019

    Follow-up of the work of the company TRAGEDEL by his excellence the Minister of Energy Development and Hyrdaulic Resources of the Central African Republic

    Follow-up of the work Civil Engineering by his excellence the MINISTER OF ENERGY DEVELOPMENT AND WATER RESOURCES Mr GONTRAN DJONO AHABA

    31/01/2020

    Signature of project contract `Acquisition, Assembly and Installation of Solar Photovoltaic Public Lighting Lamps inthe Cities of Bangassou in the Central African Republic`

    Signing of the Assembly and Installation Contract for street lighting using photovoltaic solar panels in the towns of Bangassou with UNOPS

    25/07/2020

    Inauguration ceremonies in the presence of His Excellency Faustin-Archange Touadéra President of the Central African Republic

    Partnership with global players in the renewable energy sector

    28/10/2018

    Signing of the 10 MW contract and installation and photovoltaic lighting of the city of Bangui in the Central African Republic

    Contract signed in Central African Republic (CAR) The aim of the project is to acquire and install the 4 generators with a production capacity of 2.5 MW for each of them, and the public photovoltaic lighting of the capital Bangui by its excellence the Ministry of Economy of Planning and Cooperation-RCA and TRAGEDEL .